 |
| |
|
 |
PROJECTS Click
on the project title |
 |
RDAC, The Royal Marsden Hospital, Chelsea, SW3
|
 |
Bridge Court, 73-81 Southwark Bridge Road, London, SE1
|
 |
53/54 Grosvenor Street, London, SW1
|
 |
The Chinese Church in London, London, W6
|
 |
External and Internal Refurbishment and Restoration Works
|
 |
Hornton Court, Kensington High Street, London, W8
|
 |
Northern Cross, Basingview, Basingstoke, Hampshire
|
 |
45-48, Bow Lane, London, EC4
|
 |
London Ambulance Service Headquarters, London, SE1
|
 |
The Barkers Centre, Kensington, London, W8
|
 |
Shepherd Hall, St Thomas' Hospital, London, SE1
|
 |
187 Fleet Street, London, EC4
|
 |
New Critical Care Unit, North Wing, Charing Cross Hospital, London, W6
|
 |
New Main Staircase to Old Building, The London School of Economics & Political Science, London, WC2
|
 |
Morden Cottage, Morden Hall Park, Surrey
|
 |
St John’s Church, London, W13
|
 |
11-15 Manchester Mews, London, W1
|
 |
Ealing Broadway Business Recovery, London, W5
|
 |
New MRI Suite, The Royal Marsden Hospital, London, SW3
|
 |
New Reception Area, The Royal Marsden Hospital, London, SW3
|
 |
Media House, London, W4
|
 |
|
 |
The Hammersmith Hospitals NHS Trust
The works comprised the alteration and refurbishment of an existing area on the eleventh floor to form a new twelve bed critical care unit. The facilities provided also included two isolation rooms and a theatre.
The area was serviced to a very high level, most bed positions were provided with three service pendants all installed as part of the contract.
The works were generally completed to a very high specification and standard, utilising areas of glass partitioning, limestone flooring, and Scan Module furniture with corian worktops.
Project:
New Critical Care Unit, North Wing, Charing Cross Hospital, London, W6
Contract Administrator:
Tangram
|
 |