 |
| |
|
 |
PROJECTS Click
on the project title |
 |
RDAC, The Royal Marsden Hospital, Chelsea, SW3
|
 |
Bridge Court, 73-81 Southwark Bridge Road, London, SE1
|
 |
53/54 Grosvenor Street, London, SW1
|
 |
The Chinese Church in London, London, W6
|
 |
External and Internal Refurbishment and Restoration Works
|
 |
Hornton Court, Kensington High Street, London, W8
|
 |
Northern Cross, Basingview, Basingstoke, Hampshire
|
 |
45-48, Bow Lane, London, EC4
|
 |
London Ambulance Service Headquarters, London, SE1
|
 |
The Barkers Centre, Kensington, London, W8
|
 |
Shepherd Hall, St Thomas' Hospital, London, SE1
|
 |
187 Fleet Street, London, EC4
|
 |
New Critical Care Unit, North Wing, Charing Cross Hospital, London, W6
|
 |
New Main Staircase to Old Building, The London School of Economics & Political Science, London, WC2
|
 |
Morden Cottage, Morden Hall Park, Surrey
|
 |
St John’s Church, London, W13
|
 |
11-15 Manchester Mews, London, W1
|
 |
Ealing Broadway Business Recovery, London, W5
|
 |
New MRI Suite, The Royal Marsden Hospital, London, SW3
|
 |
New Reception Area, The Royal Marsden Hospital, London, SW3
|
 |
Media House, London, W4
|
 |
|
 |
Shepherd Hall Restaurant, St. Thomas' Hospital
The refurbishment and renovation of Shepherd Hall Restaurant, including the servery area, entrance corridor, back of house areas and associated M&E services works in the basement were completed in 12 weeks.
DINING HALL and CORRIDOR ■ Formation of new structural openings. ■ Renovation of joinery, timber panelling, wood block flooring and mosaic flooring in the corridor. ■ Refurbishment and renovation of windows and feature external doors, the latter removed from site for renovation with temporary waterproof screens being erected. ■ New floating suspended ceiling panels with specialist lighting. ■ M & E services upgraded and extended.
SERVERY ■ Complete strip out and replacement of all catering equipment & servery furniture to a re-modelled layout. ■ Modification of services together with a new air conditioning installation and extract canopy. ■ New ceramic tiling, suspended ceilings, roller shutters & decorations.
BACK OF HOUSE AREAS ■ Alterations, upgrading and refurbishment of office and staff changing areas.
BASEMENT ■ Installation of a replacement air handling unit, extract plant and ductworks in a confined space with awkward access.
Project:
Shepherd Hall, St Thomas' Hospital, London, SE1
Contract Administrator:
T P Bennett
 |
| Shepherd Hall Restaurant |
|
 |