 |
| |
|
 |
PROJECTS Click
on the project title |
 |
RDAC, The Royal Marsden Hospital, Chelsea, SW3
|
 |
Bridge Court, 73-81 Southwark Bridge Road, London, SE1
|
 |
53/54 Grosvenor Street, London, SW1
|
 |
The Chinese Church in London, London, W6
|
 |
Hornton Court, Kensington High Street, London, W8
|
 |
Northern Cross, Basingview, Basingstoke, Hampshire
|
 |
45-48, Bow Lane, London, EC4
|
 |
London Ambulance Service Headquarters, London, SE1
|
 |
The Barkers Centre, Kensington, London, W8
|
 |
Shepherd Hall, St Thomas' Hospital, London, SE1
|
 |
187 Fleet Street, London, EC4
|
 |
New Critical Care Unit, North Wing, Charing Cross Hospital, London, W6
|
 |
New Main Staircase to Old Building, The London School of Economics & Political Science, London, WC2
|
 |
Morden Cottage, Morden Hall Park, Surrey
|
 |
St John’s Church, London, W13
|
 |
11-15 Manchester Mews, London, W1
|
 |
Ealing Broadway Business Recovery, London, W5
|
 |
New MRI Suite, The Royal Marsden Hospital, London, SW3
|
 |
New Reception Area, The Royal Marsden Hospital, London, SW3
|
 |
Media House, London, W4
|
 |
|
 |
The Royal Marsden NHS Trust : New RDAC
Refurbishment of the Basement, Ground and 1st floors of Mulberry House to form The Responsive Diagnostic Assessment Centre (RDAC) whilst the 2nd and 3rd floors remained occupied. The works included
■ The construction of a new external lift shaft to the rear of the building. ■ Associated structural alterations – removal and infill works to the existing building to form new linking lift lobbies on all five levels, two of which were in occupied areas whilst works were being undertaken. ■ On completion of the new lift installation, the existing lift was removed and the shaft converted to a service riser duct for enhanced services infrastructure works. ■ Structural alteration works to reconfigure the front entrance area to give improved access and incorporating a new staircase up to 1st floor level, with a structural glazed enclosure. ■ Complete stripping out, refurbishment and fitting out of the Ground and 1st floors, including all new M&E services installations, together with the formation of staff areas in the basement. ■ Construction of a new external steel framed plant deck to the rear of the building at 1st floor level. ■ Maintenance of services, access and escape routes to the 3rd and 4th floors. ■ Enhancement works to the front elevation and entrance in Dovehouse Street, including a new canopy and Sto rendering enhancement.
Project:
RDAC, The Royal Marsden Hospital, Chelsea, SW3
Contract Administrator:
Ansell and Bailey
 |
| Reception Desk |
|
 |